Saturday, 9 January 2016

Electric train project runs on solar,battery.


My electric train runs on solar, battery,energy harvesting by breaks or suspension system. 




PROJECT RELATED

PROJECT FOR MY COLLAGE –LPU (LOVELY PROFESSIONAL UNIVERSITY)

PROJECT NAME IS MINI TRAIN AND IS OPERATED BY SOLAR,BATTERY,OR SI

ENGINE (PETROL ENGINE)

TRAIN HAVING CAPACITY TO CARRY 30 TO 40 PEOPLE AT ONCE.

A.G. GEARING SYSTEM IS USED IN THE ENGINE.

IT RUNS ON TRACK HAVING TWO BOOGIES INCLUDING ENGINE.

IT IS USED IN COLLAGE,UNIVERSITY,INDUSTRY AND MINI TRANSPORT.

IT IS USED WITH IN THE RADIUS OF 5 KM TO 10 KM RANGE.

IT IS CHARGEABLE BY BOTH ELECTRICITY AS WELL AS SOLAR.

MAXIMUM SPEED OF THE ENGINE IS 50 KM/H.










No comments:

Post a Comment