My electric train runs on solar, battery,energy harvesting by breaks or suspension system.
PROJECT RELATED
u PROJECT FOR MY COLLAGE –LPU (LOVELY PROFESSIONAL UNIVERSITY)
u PROJECT NAME IS MINI TRAIN AND IS OPERATED BY SOLAR,BATTERY,OR SI
ENGINE (PETROL ENGINE)
u TRAIN HAVING CAPACITY TO CARRY 30 TO 40 PEOPLE AT ONCE.
u A.G. GEARING SYSTEM IS USED IN THE ENGINE.
u IT RUNS ON TRACK HAVING TWO BOOGIES INCLUDING ENGINE.
u IT IS USED IN COLLAGE,UNIVERSITY,INDUSTRY AND MINI TRANSPORT.
u IT IS USED WITH IN THE RADIUS OF 5 KM TO 10 KM RANGE.
u IT IS CHARGEABLE BY BOTH ELECTRICITY AS WELL AS SOLAR.
u MAXIMUM SPEED OF THE ENGINE IS 50 KM/H.

No comments:
Post a Comment